Jacket emerald Symphony. The Work Of Elena Saenko

Жакет Изумрудная симфония. Работа Елены Саенко вязание и схемы вязания

Jacket "emerald Symphony" knitted from Italian Merino wool excellent quality. Yarn consumption 800 gr , spokes № 3,5 and 4,5 . Jacket size 54.

Жакет Изумрудная симфония. Работа Елены Саенко вязание и схемы вязания
Жакет Изумрудная симфония. Работа Елены Саенко вязание и схемы вязания

Description of jacket magazine:

Size 36/38.

You will need: 900 g of yarn khaki (100% cotton, 140 m/50 g); spokes № 3,5 and 4,5; hook № 3,5; 7 buttons; shoulder pads.

Gum hollow: 1st p.: chrome., * 1 item to remove, as in the purl knitting (thread at work), P1., repeat from *, chrome. 2nd and all following rows: chrome., * knit the loop of the previous row to remove, as in the purl knitting, filmed loop of the previous row purl, repeat from *, chrome.

The reverse surface of: facial series — back loops, purl rows — facial hinge.

The front surface of: facial series — facial loops, purl rows — purl loops.

"Spit" at 6 p.: 1st — 6-th p.: facial surface. 7-th p.: 3 p. to leave on auxiliary spoke before work, 3 l e., then
knit into the front loop with the supporting spokes. 8th R.: purl loops. Repeat 1st to 8th rows.

Pearl pattern: alternately 1 front, 1 purl, pattern to shift every 2 rows.

"Grid": knit according to the scheme.

The density of knitting: 24 p. x 26 p. = 10 x 10 cm due pattern "grid". 20 p. x 26 p. = = 10x10 cm, associated purl stitch, 6 p. "spit" = approx. 2 cm wide.

This jacket was knitted in 2 strands! Side bevel (see drawing) arise when changing patterns due to the different density.

Back: on the spokes №3,5 dial 116 p. and knit 6 p. hollow rubber band. Then knit spokes № 4,5 in the following sequence: chrome., 30 p. "mesh" under the scheme I, * 6 p. "spit", 10 p. purl stitch, from * repeat 2 times, 6 p. "spit", 30 p. "mesh" according to the scheme II, chrome. Peplum for loop to subtract the following: 7, 9, 11, and 15-m p. in each band the reverse surface of the first and last 2 p. knit together. and in the 19th R. p. to the remaining 2 stitches together purl; 23rd R. the reverse loop and the previous loop knit together. = = 86 p. 25-m R. to start obuvki schemes I and II and between the "braids" to add 1 purl loop. These increases in next 3 front rows repeat = 90 p., then each of the front row after the first "spit" and before the last "slash" to add * 3% at 2 p. and 4 times 1 p., from * repeat 2 times, increase knit in accordance with the pattern (= alternately 6 p. "spit", 4 p. purl stitch) = 108 p. 29 cm from the bottom edge of part (= end schemes) to close both sides for armholes 1 times 5 STS, 2 times in 3 p and 4 times for 1 n. in each 2-m p. = = 78 p. Next knit straight and at a height of 49 cm from the bottom edge of the loop close.

Right shelf: on the spokes № 3,5 dial 64п. to iwatate 6P. hollow rubber band. Then knit spokes №4,5 in the following sequence: chrome., 6 p. pearl pattern, with the 1st hole for the buttons in the 3rd and 4th p. knit across the row together, 1 yo, * 6 p. "spit", 4 p. purl stitch, from * repeat 1 time, 6 p. "spit", 30 p. "mesh" according to the scheme II, chrome. The other 4 holes for the buttons execute at a distance of 7 cm from each other. In the 33rd R. and every front row before the last "slash" to add * 3% at 2 p. and 4 times 1 p., from * repeat 2 times, allowances to include in the corresponding patterns (= alternately 6 p. "spit", 4 p. the reverse surface), while for the scheme to make obuvki = 73 p. Through 29 cm from the bottom edge of the part (= the end of the diagram) close to the left edge for armhole 1 time 9 p., 2 times for 3 p. and 4 times
1 n in each 2-m p. (=p. 54). At the same time from the same mark to expand to lapel pearl pattern 16 times povezav in each front row to the left more at 1 p. Through 41 cm from the bottom edge of the part close to the right edge of the lapel 12 p., then close for neck in each 2-m R.
2 times in 3 p., 2 times 2 n and 4 times for 1 n. At a height of 49 cm from the bottom edge to close the remaining 28 STS shoulder.

Left shelf: knit symmetrically right shelf, to do this, after 6 p. hollow gum knit in the following sequence: chrome., 30 p. "mesh" under the scheme I, * 6 p. "spit", 4 p. purl stitch, from * repeat 1 time, 6 p. "spit", 6 p. pearl pattern, chrome. Detail knit without buttonholes.

Sleeve: on spokes №3,5 dial 48 p. and knit 6 p. hollow rubber band. Then the spokes № 4,5 knit according to the scheme "net", while carrying out lateral raises, and in the last purl row add evenly to p. 42 = 96 p. Then knit as follows: chrome., 29 p. purl stitch, * 6 § "spit" (starting with the 5th R. pattern), 4 p. purl stitch, from * repeat 2 times, 6 p. "spit", 29 p. purl stitch, chrome. Through 38 cm from the bottom edge to close on both sides 1 times 4 STS and 4 times 1 item in every 2nd p. (= 80), then knit straight. Through 56 cm from the lower edge of the part to the whole row knit across the row at 4 p. close together and the remaining 20 p.

Build: to perform shoulder, side seams and seams of sleeves. For bakey to score around the edge of the cut (departing 12 p. each side to cuffs) 59 n. and knit наспицах4,5следующим follows: 1st — 4th p.: front surface; 5-th p.: * 2. stitches together front, 1 yo, repeat from *, end 1 individuals; 6 th — 9 th R.: facial surface. Loops to close. Bake doubled, turning on the wrong side, and sew. Vertical edges of shelves, including the cuffs, tie
1 p. columns without nakida and "crayfish step" (= columns without nakida knit from left to right). Sew sleeves, priborov at the top of the crown. Sew on buttons, remove the flaps on the front side and attach the buttons to the shelves. Sew the shoulder pads.

Scheme knitting jacket:

Жакет Изумрудная симфония. Работа Елены Саенко вязание и схемы вязания

This is an automatic translation of the publication in Russian.

Post author

User avatar

Elena Saenko

12 posts since 2016

Handmade freelancer

Переведено сервисом Яндекс.Переводчик

Работаю!